Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 14, 2022     HS and elevator tips - (4 hours)       Category: Tail Feathers
Sam attached aluminum backer strips to right HS and elevator tips. Trimmed the left HS tip of excess fiberglass and epoxy. Also removed the foam insert in the left HS tip and added additional layers of fiberglass and epoxy to support the outer layer of glass. Laid up and epoxied a layer of glass on the left elevator transition betweeen the tip and aluminum edge. Used a strip of plastic to apply the epoxy soaked glass to the tip/elevator transition and to the left elevator tip.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.